Mark the boundary that matters
A placement sketch should show more than an empty rectangle. It needs to explain who controls the space, how people get to the toilet and how the rental provider reaches it for every visit. Resolve those questions before treating a position as ready.
Begin with the property owner or project team’s approved area. Show the building entrance, fence or gate, public walkway and proposed equipment position. If the plan crosses into a street or sidewalk, have the responsible team establish the applicable permission. NYC DOT includes equipment placement in its street-work permit information; an adjacent space is not automatically part of your site.
Keep the permission question tied to the actual activity and location. A private-yard arrangement and equipment associated with permitted construction can follow different approval paths. The rental request should describe the agreed position, not assume the quote authorises occupation of public space.
Draw two approaches to the same unit
The user route leads from the work or event area to the door. Note changes in level, surfaces, gates and crowd movement, including the approach to accessible facilities and washing. Keep the arrangement understandable for someone arriving for the first time.
The provider route covers unloading, servicing and collection. Describe the actual entrance, vehicle restrictions and any shared loading area. A cabin that can be carried through a passage is not proof that the proposed provider can service it there. Send measurements or clear site photographs when requested rather than guessing at clearance.
Test the position against the rest of the job
Imagine the equipment installed while the property is busiest. A dumpster exchange, incoming materials or a guest queue may need the same space. Decide with the site team which activities can coexist and which need separate windows. The approved position must remain useful after setup is complete.
Specify who can open the gate for each visit and who can authorise a change. If scaffolding or stored materials later block access, contact the provider before moving a unit. Relocation can affect service access and the original placement agreement.
Keep delivery and removal in the same plan
Provide the first time the site can receive equipment, the first time people will use it, and the final use including cleanup. Separating these moments helps expose a venue handback that occurs before the desired collection window.
Agree cleaning, restocking and waste-service access during the hire. Review the collection contact and any extension procedure in the order. An event ending or a gate being locked does not itself notify the provider that equipment can be removed.
Questions before you book
Does the supplier choose the final position alone?
The provider assesses equipment access and setup, while the property or event team establishes permission and site responsibilities. Share the agreed location with both before confirming delivery.
What if the site layout changes after booking?
Send the revised layout and explain the changed access or position. Obtain the provider’s agreement before relocating equipment or relying on a different service route.